DOWNLOADS
CLICK TO ENLARGE
INTRODUCTION
INTRODUCTION
MARKETS
MARKETS
PROJECTS
PROJECTS
NEWS
NEWS
QHSE
QHSE
FLEET
FLEET
JOBS
JOBS
DOWNLOADS
DOWNLOADS
CONTACT
CONTACT

Jumbo Ship Windfarm

Jumbo Ship Simulator
J1 Jumbo Javelin
Ship Particular for:
mv Jumbo Javelin J1

CLICK HERE TO OPEN FILE (477,34 KB)
(right-click to download file)

J3 Fairplayer
Ship Particular for:
mv Fairplayer J3

CLICK HERE TO OPEN FILE (659,82 KB)
(right-click to download file)

J-1800 Offshore
Ship Particular for:
DP2 Jumbo Javelin J1 and DP2 Fairplayer J3

CLICK HERE TO OPEN FILE (941,92 KB)
(right-click to download file)

J1800
3D animation

Project file: Greater Gabbard Offshore Wind Farm

CLICK HERE TO OPEN FILE (778,45 KB)
(right-click to download file)

Project File Kikeh Pile Installation

CLICK HERE TO OPEN FILE (512,96 KB)
(right-click to download file)

Project movie: Kikeh Pile Installation

Project File BritSats

CLICK HERE TO OPEN FILE (310,67 KB)
(right-click to download file)

Project movie: Britsats

Project File Northeast Gateway

CLICK HERE TO OPEN FILE (676,31 KB)
(right-click to download file)

Project movie: Northeast Gateway

Jumbo_Offshore_Wind_2012.pdf
The use of DP II HLV's for Offshore Wind Farm construction

CLICK HERE TO OPEN FILE (2,57 MB)
(right-click to download file)

Crew Promotion Movie

Jumbo Offshore Video
Introduction of the J1800 class heavy lift vessel as offshore
transport and installation vessel, showing the following projects:
- J1800 intro
- Britannia Satellites project
- Kikeh project
- J-lay tower
- Platform installation
- Deep water capability
- Northeast Gateway Project

Jumbo Offshore: Amethyst Project
Amethyst Project Subsea Template Installation, June 2009

First offshore windturbine transition piece installation by Jumbo Offshore
Jumbo Offshores engineers and the crew of DP2-vessel Jumbo Javelin have successfully installed their first Transition Piece (TP), off the UKs south-east coast. This is the first time that a TP has been transported and installed with only one DP2 vessel. The installation trial included leveling and grouting operations and even the removal of the TP. With a workability for critical lifts in wave heights up to at least Hs = 1.5m*, Jumbo Offshore is now able to deliver various installation services for offshore wind farms.

DDS - Manifold
Jumbo Offshore Animation DDS manifold

QHSE Policy
QUALITY, HEALTH, SAFETY & ENVIRONMENT
by M. Kahn, Managing Director.

CLICK HERE TO OPEN FILE (199,05 KB)
(right-click to download file)

ISO 9001 Certificate
ISO 9001 Certificate
by "Lloyd's Register Quality Assurance"

CLICK HERE TO OPEN FILE (723,34 KB)
(right-click to download file)

Document Of Compliance
Document Of Compliance
by "Inspectie Verkeer en Waterstaat"

CLICK HERE TO OPEN FILE (367,59 KB)
(right-click to download file)

OHSAS Certificate

CLICK HERE TO OPEN FILE (548,96 KB)
(right-click to download file)

BACK TO TOP

DISCLAIMER